GD&T True Position Datum Schemes Supported in Measure 10.1
See the link below for the Measure 10.1 datum schemes that are supported for True Position. Measure 10 requires that all degrees of freedom (DoF) are fully constrained.
Click here to download: FARO Measure 10.1 Supported GD&T Datum Schemes for True Position
Keywords: M10, datum, GD&T, geometric tolerances, TP, positional tolerance, MMC, RFS, LMC, active alignment